Description:
As the General Foreman, you will be an integral member of the Site team. Ideally you will have experience within civils and/or highways infrastructure projects.
The project consists of constructing a 550-metre-long road, with a 250-metre viaduct set to be built over the Great Stour River, the river’s flood plain, and the railway line from Canterbury to Ramsgate. The viaduct will be supported by a 5-span structure, with the longest span distance being 56 metres apart.
About You
| Organization | Volker Wessels |
| Industry | Other Jobs Jobs |
| Occupational Category | General Foreman |
| Job Location | Kent,UK |
| Shift Type | Morning |
| Job Type | Full Time |
| Gender | No Preference |
| Career Level | Experienced Professional |
| Experience | 5 Years |
| Posted at | 2026-06-14 2:14 pm |
| Expires on | 2026-07-29 |